This guide describes how to assign a unit to the rides of a certain schedule for a long period so as not to do it manually every time in the future.
From now on, when rides are created for this schedule, the indicated unit will be assigned to them automatically.
To replace the unit for one time (for example, in case of a breakdown) you can assign another unit on the Rides page.