Shifts
In the Shifts section, you can configure work shifts which should be used to structure information in reports.
To configure shifts, follow these steps:
- Click on the icon to the left of the Shifts section.
- Specify the shift name (by default, the first shift is named Shift1, and the following ones, Shift2, Shift3, etc.)
- Specify the start and end time of the shift (for example, 09:00–17.00).
- Click Add shift ().
- Add the required number of shifts following steps 2–4.
To delete a shift, click on the icon next to it.
If you don’t want the events of a shift which ends in a new day to be related to the previous day (that is, the day when the shift started), enable the Split overnight shifts option.
After configuring shifts, go to the table settings, add the grouping of the Shift type, and enable the Retrieve intervals option.
Regardless of the shift settings, the report displays data only for the specified interval.
Was this helpful?
Download
All pages
Only this page